I noticed that if there are two contractors, “John” and “Jane”, and they are a Team, “The Does”, availability for the team needs to be set individually.

For example.

Jane might be available Monday-Friday
John might be available Friday-Sunday

As it is, the teams availability needs to be set as well.

I think it would preferable if you could have the teams availability be an aggregate of the team members’ individual schedules.

So given the above example, Jane and John are both available Friday, so the team should automatically be available only for Friday as well. At least, I think this should be an option to do it this way.